The node upgrade was successful. Took a bit longer than planned because the HDD containing user VM data could not be connected at the same time as the new SSD, so the VMs had to be backed up then restored over the network.
Existing and new VMs have had their RAM bumped from 1.5GiB to 4GiB.
Existing VMs had 2 days added to their next renewal date.